Adding a flow constraint to a node

Definition

Method

  1. Left click on a node.
  2. Expand the node in the node inspector (on the right margin).
  3. Check, "Enable Capacity".
  4. Enter in a number for the total number of units that can flow throw the facility during the period of the scenario.

NOTE: This might leave some customers as "orphans" -- their demand is not satisfied. If so, either run the "Solve for..." to connect them or create a lane from a facility that has not reached its capacity limit.